PROJECT
Langley Covered Bridge
Centerville, Michigan
CLIENT
St. Joseph County Road Commission and Architecture + Design
SCOPE
Evaluate 125-year-old heavy timber covered bridge, one of the last still in use in Michigan. Perform structural analysis of timber trusses, develop repair and strengthening recommendations for highway loadings. Address maintenance of concrete abutments and structural steel substructure. Develop plans and specifications for repair.
DATE
2005 – 2007